香蕉视频+在线观看+色吧,熟女内射v888av,亚洲av无码专区色爱天堂老鸭,麻豆安全免费网址入口

丁基膠涂膠機的操作要注意什么?

時間:2023-07-07 來源:http://www.aabrs.cn/ 發布人:昌盛機械

1. 準備工作:將需要涂布的鋁隔條準備好,檢查涂布機的各項參數是否正常。
1. Preparation: prepare the aluminum spacer strip to be coated, and check whether the parameters of the coating machine are normal.
2. 調整設備:根據需要調整涂布機的涂布速度、壓力和溫度等參數,確保涂布質量符合要求。
2. Adjusting equipment: Adjust the coating speed, pressure, and temperature parameters of the coating machine as needed to ensure that the coating quality meets the requirements.
3. 丁基膠涂布機在常溫下呈固體形態,須經過110-150℃得高溫才能融化使用,因丁基膠導熱較慢須加熱20-30分鐘(視氣溫而定)才能完全融化,所以要求每次使用該機之前要加熱膠缸、膠頭(110-150℃下保溫)待膠融化后才能進行工作 。

立式丁基膠涂布機
3. The butyl adhesive coating machine is in a solid form at room temperature and must undergo a high temperature of 110-150 ℃ before melting. Due to the slow thermal conductivity of the butyl adhesive, it needs to be heated for 20-30 minutes (depending on the temperature) to fully melt. Therefore, it is required to heat the rubber cylinder and head (insulated at 110-150 ℃) before each use of the machine before starting work.
4. 監控涂布質量:丁基膠絕對不能出現斷膠,鋁條露白,這是影響中空玻璃壽命的關健。確保涂布的均勻性和厚度符合要求。
4. Monitoring the coating quality: The butyl adhesive must not break or the aluminum strip is exposed, which is a key factor affecting the lifespan of the insulating glass. Ensure that the uniformity and thickness of the coating meet the requirements.
5. 完成涂布:涂布完成后,關閉涂布機的開關,清理涂布機的殘留物和廢料,保持涂布機的清潔。
5. Complete coating: After the coating is completed, turn off the switch of the coating machine, clean the residue and waste of the coating machine, and maintain the cleanliness of the coating machine.

聯系我們Contact us

  • 咨詢熱線:0531-85717458 13705446998
  • 公司地址: 山東省德州市齊河安頭鄉企巢工業園
  • 掃碼聯系我們:

截屏,微信識別二維碼

微信號:13705446998

//