1、雙組份打膠機設備應裝置在枯燥、無粉塵、無腐蝕性氣體的壞境中(該要求與其他設備分歧,當然假如條件達不到至多爭取無腐蝕性氣體,畢竟設備中有電線以及管路這些配件抗腐蝕性不高)。
1. The equipment of two-component glue beater should be installed in the condition of dull, dust-free and non-corrosive gas. (This requirement differs from other equipment. Of course, if the condition can not reach the maximum, strive for non-corrosive gas, after all, the corrosion resistance of electrical wires and pipes in the equipment is not high.)
2、室內溫度好控制在10~40度的室內堅固空中上,空中應程度度要好。(小編這里說的空中程度度要好不一定要十分的平整才行,我們的設備在設計之初曾經思索到了空中復雜性的要素所以對空中平整度是有相當大的忍讓度的,只需不是幅度提別的大普通都可以正常任務。)
2. Indoor temperature should be controlled in a solid indoor air of 10-40 degrees, and the air should be better. (Xiaobian here said that the air level is better, not necessarily very flat, our equipment at the beginning of the design has considered the elements of air complexity, so there is a considerable degree of tolerance for air level, as long as it is not the range of other general can be normal tasks.)
3、雙組份打膠機裝置之前,應先反省能否有因運輸、搬動形成的變形、損壞和緊固件松動狀況,之前就已經有客戶在挪動打膠機的進程中把設備的智能控制零碎的一個零部件碰掉了而招致設備無法正常運轉,我們的任務人員到現場后才排查出的緣由。
3. Before installing a two-component glue beater, we should first reflect on whether there is deformation, damage and loosening of fasteners caused by transportation and moving. Before that, customers have already knocked off a fragmentary part of the intelligent control of the equipment in the process of moving the glue beater, which causes the equipment to fail to work properly. Our task personnel arrived at the airport. Reasons were found after the scene.
4、我們可以依據空中平整度的實踐狀況來經過調整設備的可升降地腳螺栓來調整設備的程度度直到設備程度而穩定。然后按圖接線并牢靠接地,把氣源接入機器所配帶的氣源接口,確保無漏氣景象。
4. First of all, we can adjust the elevating anchor bolts of the equipment according to the practice of air smoothness until the equipment is stable. Then connect according to the graph and grounding firmly, and connect the air source to the air source interface of the machine, so as to ensure that there is no air leakage.
5、向油槽中加注液壓油至指定地位,46#液壓油(約爲50升左右)。
5. Fill the tank with hydraulic oil to the designated position, 46# hydraulic oil (about 50 liters).
6、接通電源并翻開檢查設備能否可以正常運轉。
6. Turn on the power supply and check whether the equipment can work properly.

雙組份打膠機

雙組份打膠機的留意事項
Notes on Two-Component Glue Punching Machine
1、在當天機器操作終了后要把膠管內的膠沖出,避免硬化;假如長工夫不適用要留意用煤油清洗膠管和膠槍。
1. After the machine operation on that day, the glue in the hose should be washed out to avoid hardening; if long time is not suitable, pay attention to cleaning the hose and gun with kerosene.
2、雙組份打膠機運用的硅酮膠或聚硫膠要留意雜質不能過高,低質量的膠容易梗塞膠管的過濾零碎,形成出膠不暢或不平均。
2. Silicone glue or polysulfide glue used in two-component glue beater should pay attention to the impurities should not be too high, low-quality glue is easy to obstruct the filter fragments of rubber hose, resulting in poor or uneven glue production.
3、在改換膠的種類時要特別留意把雙組份打膠機內殘留的膠沖凈,好清洗,由于不同種類甚至的膠容易反響梗塞機器。
3. When changing the type of glue, special attention should be paid to rinsing the residual glue in the two-component glue beater, and it is best to clean it, because different types or even brands of glue are easy to react to the obstruction machine.
4、液壓站零碎的壓力,不能調的太高,要依據室內環境溫度等實踐狀況,調至滿足膠嘴正常出膠平均打膠即可。翻開液壓站時一定要翻開膠槍,否則B組份管路壓力將升得很高,形成平安事故。
4. The piecemeal pressure of the hydraulic station can not be adjusted too high. According to the indoor environment temperature and other practical conditions, it can be adjusted to meet the normal tapping average of the rubber nozzle. When turning over the hydraulic station, the rubber gun must be turned over. Otherwise, the pressure of component B pipeline will rise very high, resulting in a safety accident.
5、A膠提膠泵延續任務1分鐘以上沒有供膠中止,闡明管路內有空氣,此時會報警,須翻開泵上管接頭再翻開A膠提膠泵,直到出膠爲止,中止并接好接頭,膠槍會呈現有空氣的嗶嗶爆破聲,空氣排凈就好了。
5. A rubber-lifting pump lasts for more than 1 minute without ceasing rubber supply. It clarifies that there is air in the pipeline. At this time, the alarm will be given. It is necessary to turn on the upper pipe joint of the pump and turn on the A rubber-lifting pump until the rubber is released, stop and connect the joint, the rubber gun will appear the beeping explosion sound of air, and the air will be discharged clean.
6、硅酮膠B 組份遇空氣會結殼,影響泵的正常任務和管路的疏通,因而,停機時B組份膠的一切通道在泄壓后均應封閉,使B組份不得接觸空氣。
6. Component B of silicone gel will crust when it meets the air, which will affect the normal task of the pump and the dredging of the pipeline. Therefore, all passages of component B of silicone gel should be closed after pressure relief, so that component B can not touch the air.
7、正常任務時不要斷氣源,假如發現斷氣源應中止任務。
7. Do not stop the gas source during normal tasks. If the gas source is found, the task should be terminated.
綜上所述有濟南昌盛機械提供,想了解更多雙組份打膠機知識,歡迎關注我們的網站:http://www.aabrs.cn謝謝支持!
In summary, all the above-mentioned Jinan Changsheng Machinery provides, want to know more about the two-component glue machine knowledge, welcome to pay attention to our website: http://www.aabrs.cn Thank you for your support!

聯系我們Contact us

  • 咨詢熱線:0531-85717458 13705446998
  • 公司地址: 山東省德州市齊河安頭鄉企巢工業園
  • 掃碼聯系我們:

截屏,微信識別二維碼

微信號:13705446998

//